Detailed Account of Flood Damages

Detailed Account of Flood Damage: 

Major railroad lines that crossed the city suffered heavy damage from the floodwaters. The Corp of Engineers provided detailed damage assessments of their condition. In addition,the Corps addressed the widescale destruction of “wood block” pavement within the city in comparison to brick and asphalt pavements. The strong floodwaters destroyed many residential and business properties  with the central business district submerged under in “6-11 feet of water.” As you read through the findings, what stands out about what the Corp of Engineers chose to highlight? 

The report details damages to other city infrastructure, including electrical utilities and water plants, as well. The Army Corp of Engineers described how “practically the entire city” was cut off from electricity and water for days after the flood. The city also lost a significant amount of telephone communications as many underground lines were submerged. Significant damage was also dealt to the San Antonio Arsenal with tens of thousands in losses of weapons, ammunition, tractors, and stationery. 

The report also addressed the tragic loss of life that took place as a result of the flooding. The Corp of Engineers attributes many of the deaths to the slow response time of the city and the poor condition of housing in lower income neighbourhoods. The report’s findings indicate 51 confirmed deaths due to flooding, although these numbers were likely an undercount.