Infrastructure in the Aftermath

A Railway Damaged from the Flood

The 1921 San Antonio flood had a significant impact on the city's transportation systems, particularly with its railroads and streetcars. Floodwaters damaged so many railroad trestles that the passenger and freight service had to be suspended, disrupting the transport of goods and people. Streetcars, used for daily transportation, were completely stalled due to both flooding and power outages, preventing residents from returning to normal routines. Additionally, countless bridges and viaducts had been damaged beyond repair, preventing residents from traveling. In his book “West Side Rising,” author Char Miller adds the financial damages the transportation infrastructure suffered, including a loss of $10,000 in railroads,  a loss of $220,000 in damages in streetcars, a loss of $400,000 in street utilities, and a loss of $2.9 million in personal property and merchandise. Without functioning transportation, it ultimately led to San Antonio civilians halting their daily life, along with cutting off 2,000 people from their jobs and supplies. This extreme loss prompted infrastructural change within the landscape of San Antonio.

(Source: West Side Rising, pages 41, 89, & 109).

Click on Elite Flight to learn how San Antonio's Elite responded in the aftermath of the flood by constructing large infrastructure projects, such as the Olmos dam, and displacing the remaining residents of the West Side.